Lead Paint Risk in Mexico Beach, FL
15.3%Pre-1978 Housing
197Pre-1978 Units
1,291Total Housing Units
LowRisk Level
How Mexico Beach Compares
What This Means for Mexico Beach Residents
Most housing in Mexico Beach was built after 1978 (84.7% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Mexico Beach
Get a more detailed risk assessment for a specific address.