Lead Paint Risk in Mexico Beach, FL

15.3%Pre-1978 Housing
197Pre-1978 Units
1,291Total Housing Units
LowRisk Level

How Mexico Beach Compares

Mexico Beach
15.3%!<(MISSING)/span>
Florida
34.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Mexico Beach Residents

Most housing in Mexico Beach was built after 1978 (84.7% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Mexico Beach

Get a more detailed risk assessment for a specific address.