Lead Paint Risk in Malabar, FL
18.3%Pre-1978 Housing
250Pre-1978 Units
1,366Total Housing Units
LowRisk Level
How Malabar Compares
What This Means for Malabar Residents
Most housing in Malabar was built after 1978 (81.7% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Malabar
Get a more detailed risk assessment for a specific address.