Lead Paint Risk in Hurlburt Field, FL

8.0%Pre-1978 Housing
66Pre-1978 Units
828Total Housing Units
LowRisk Level

How Hurlburt Field Compares

Hurlburt Field
8.0%!<(MISSING)/span>
Florida
34.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Hurlburt Field Residents

Most housing in Hurlburt Field was built after 1978 (92.0% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Hurlburt Field

Get a more detailed risk assessment for a specific address.