Lead Paint Risk in Heathrow, FL

2.2%Pre-1978 Housing
69Pre-1978 Units
3,168Total Housing Units
LowRisk Level

How Heathrow Compares

Heathrow
2.2%!<(MISSING)/span>
Florida
34.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Heathrow Residents

Most housing in Heathrow was built after 1978 (97.8% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Heathrow

Get a more detailed risk assessment for a specific address.