Lead Paint Risk in Berkshire Lakes, FL

7.4%Pre-1978 Housing
113Pre-1978 Units
1,537Total Housing Units
LowRisk Level

How Berkshire Lakes Compares

Berkshire Lakes
7.4%!<(MISSING)/span>
Florida
34.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Berkshire Lakes Residents

Most housing in Berkshire Lakes was built after 1978 (92.6% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Berkshire Lakes

Get a more detailed risk assessment for a specific address.