Lead Paint Risk in Dover Base Housing, DE
4.7%Pre-1978 Housing
60Pre-1978 Units
1,268Total Housing Units
LowRisk Level
How Dover Base Housing Compares
What This Means for Dover Base Housing Residents
Most housing in Dover Base Housing was built after 1978 (95.3% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Dover Base Housing
Get a more detailed risk assessment for a specific address.