Lead Paint Risk in Collinsville, CT
48.4%Pre-1978 Housing
877Pre-1978 Units
1,811Total Housing Units
ElevatedRisk Level
How Collinsville Compares
What This Means for Collinsville Residents
Collinsville has an elevated level of pre-1978 housing (48.4%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Collinsville
Get a more detailed risk assessment for a specific address.