Lead Paint Risk in Wellington, CO
7.0%Pre-1978 Housing
286Pre-1978 Units
4,059Total Housing Units
LowRisk Level
How Wellington Compares
What This Means for Wellington Residents
Most housing in Wellington was built after 1978 (93.0% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Wellington
Get a more detailed risk assessment for a specific address.