Lead Paint Risk in Parker, CO
3.6%Pre-1978 Housing
798Pre-1978 Units
22,340Total Housing Units
LowRisk Level
How Parker Compares
What This Means for Parker Residents
Most housing in Parker was built after 1978 (96.4% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Parker
Get a more detailed risk assessment for a specific address.