Lead Paint Risk in Parker, CO

3.6%Pre-1978 Housing
798Pre-1978 Units
22,340Total Housing Units
LowRisk Level

How Parker Compares

Parker
3.6%!<(MISSING)/span>
Colorado
40.6%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Parker Residents

Most housing in Parker was built after 1978 (96.4% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Parker

Get a more detailed risk assessment for a specific address.