Lead Paint Risk in Mulford, CO

56.1%Pre-1978 Housing
124Pre-1978 Units
221Total Housing Units
ElevatedRisk Level

How Mulford Compares

Mulford
56.1%!<(MISSING)/span>
Colorado
40.6%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Mulford Residents

Mulford has an elevated level of pre-1978 housing (56.1%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.

Check a Specific Address in Mulford

Get a more detailed risk assessment for a specific address.