Lead Paint Risk in Milliken, CO

5.6%Pre-1978 Housing
175Pre-1978 Units
3,152Total Housing Units
LowRisk Level

How Milliken Compares

Milliken
5.6%!<(MISSING)/span>
Colorado
40.6%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Milliken Residents

Most housing in Milliken was built after 1978 (94.4% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Milliken

Get a more detailed risk assessment for a specific address.