Lead Paint Risk in Mead, CO

5.7%Pre-1978 Housing
107Pre-1978 Units
1,867Total Housing Units
LowRisk Level

How Mead Compares

Mead
5.7%!<(MISSING)/span>
Colorado
40.6%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Mead Residents

Most housing in Mead was built after 1978 (94.3% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Mead

Get a more detailed risk assessment for a specific address.