Lead Paint Risk in El Jebel, CO

12.9%Pre-1978 Housing
190Pre-1978 Units
1,477Total Housing Units
LowRisk Level

How El Jebel Compares

El Jebel
12.9%!<(MISSING)/span>
Colorado
40.6%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for El Jebel Residents

Most housing in El Jebel was built after 1978 (87.1% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in El Jebel

Get a more detailed risk assessment for a specific address.