Lead Paint Risk in Echo Hills, CO
16.3%Pre-1978 Housing
26Pre-1978 Units
160Total Housing Units
LowRisk Level
How Echo Hills Compares
What This Means for Echo Hills Residents
Most housing in Echo Hills was built after 1978 (83.7% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Echo Hills
Get a more detailed risk assessment for a specific address.