Lead Paint Risk in Colorado Springs, CO
40.0%Pre-1978 Housing
82,847Pre-1978 Units
207,078Total Housing Units
ElevatedRisk Level
How Colorado Springs Compares
What This Means for Colorado Springs Residents
Colorado Springs has an elevated level of pre-1978 housing (40.0%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Colorado Springs
Get a more detailed risk assessment for a specific address.