Lead Paint Risk in Castle Pines Village, CO

0.7%Pre-1978 Housing
13Pre-1978 Units
1,796Total Housing Units
LowRisk Level

How Castle Pines Village Compares

Castle Pines Village
0.7%!<(MISSING)/span>
Colorado
40.6%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Castle Pines Village Residents

Most housing in Castle Pines Village was built after 1978 (99.3% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Castle Pines Village

Get a more detailed risk assessment for a specific address.