Lead Paint Risk in Castle Pines, CO

3.7%Pre-1978 Housing
172Pre-1978 Units
4,628Total Housing Units
LowRisk Level

How Castle Pines Compares

Castle Pines
3.7%!<(MISSING)/span>
Colorado
40.6%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Castle Pines Residents

Most housing in Castle Pines was built after 1978 (96.3% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Castle Pines

Get a more detailed risk assessment for a specific address.