Lead Paint Risk in Castle Pines, CO
3.7%Pre-1978 Housing
172Pre-1978 Units
4,628Total Housing Units
LowRisk Level
How Castle Pines Compares
What This Means for Castle Pines Residents
Most housing in Castle Pines was built after 1978 (96.3% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Castle Pines
Get a more detailed risk assessment for a specific address.