Lead Paint Risk in Berthoud, CO

17.1%Pre-1978 Housing
792Pre-1978 Units
4,636Total Housing Units
LowRisk Level

How Berthoud Compares

Berthoud
17.1%!<(MISSING)/span>
Colorado
40.6%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Berthoud Residents

Most housing in Berthoud was built after 1978 (82.9% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Berthoud

Get a more detailed risk assessment for a specific address.