Lead Paint Risk in Avon, CO

9.6%Pre-1978 Housing
418Pre-1978 Units
4,360Total Housing Units
LowRisk Level

How Avon Compares

Avon
9.6%!<(MISSING)/span>
Colorado
40.6%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Avon Residents

Most housing in Avon was built after 1978 (90.4% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Avon

Get a more detailed risk assessment for a specific address.