Lead Paint Risk in Temescal Valley, CA

3.1%Pre-1978 Housing
283Pre-1978 Units
9,178Total Housing Units
LowRisk Level

How Temescal Valley Compares

Temescal Valley
3.1%!<(MISSING)/span>
California
56.7%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Temescal Valley Residents

Most housing in Temescal Valley was built after 1978 (96.9% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Temescal Valley

Get a more detailed risk assessment for a specific address.