Lead Paint Risk in Temescal Valley, CA
3.1%Pre-1978 Housing
283Pre-1978 Units
9,178Total Housing Units
LowRisk Level
How Temescal Valley Compares
What This Means for Temescal Valley Residents
Most housing in Temescal Valley was built after 1978 (96.9% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Temescal Valley
Get a more detailed risk assessment for a specific address.