Lead Paint Risk in Sultana, CA
54.8%Pre-1978 Housing
142Pre-1978 Units
259Total Housing Units
ElevatedRisk Level
How Sultana Compares
What This Means for Sultana Residents
Sultana has an elevated level of pre-1978 housing (54.8%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Sultana
Get a more detailed risk assessment for a specific address.