Lead Paint Risk in Stevenson Ranch, CA
3.4%Pre-1978 Housing
244Pre-1978 Units
7,244Total Housing Units
LowRisk Level
How Stevenson Ranch Compares
What This Means for Stevenson Ranch Residents
Most housing in Stevenson Ranch was built after 1978 (96.6% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Stevenson Ranch
Get a more detailed risk assessment for a specific address.