Lead Paint Risk in Stebbins, CA
14.6%Pre-1978 Housing
42Pre-1978 Units
288Total Housing Units
LowRisk Level
How Stebbins Compares
What This Means for Stebbins Residents
Most housing in Stebbins was built after 1978 (85.4% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Stebbins
Get a more detailed risk assessment for a specific address.