Lead Paint Risk in Stebbins, CA

14.6%Pre-1978 Housing
42Pre-1978 Units
288Total Housing Units
LowRisk Level

How Stebbins Compares

Stebbins
14.6%!<(MISSING)/span>
California
56.7%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Stebbins Residents

Most housing in Stebbins was built after 1978 (85.4% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Stebbins

Get a more detailed risk assessment for a specific address.