Lead Paint Risk in Roseville, CA

17.0%Pre-1978 Housing
10,230Pre-1978 Units
60,107Total Housing Units
LowRisk Level

How Roseville Compares

Roseville
17.0%!<(MISSING)/span>
California
56.7%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Roseville Residents

Most housing in Roseville was built after 1978 (83.0% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Roseville

Get a more detailed risk assessment for a specific address.