Lead Paint Risk in Poway, CA
56.6%Pre-1978 Housing
9,606Pre-1978 Units
16,969Total Housing Units
ElevatedRisk Level
How Poway Compares
What This Means for Poway Residents
Poway has an elevated level of pre-1978 housing (56.6%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Poway
Get a more detailed risk assessment for a specific address.