Lead Paint Risk in Post Mountain, CA

15.2%Pre-1978 Housing
25Pre-1978 Units
164Total Housing Units
LowRisk Level

How Post Mountain Compares

Post Mountain
15.2%!<(MISSING)/span>
California
56.7%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Post Mountain Residents

Most housing in Post Mountain was built after 1978 (84.8% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Post Mountain

Get a more detailed risk assessment for a specific address.