Lead Paint Risk in Plumas Lake, CA

2.0%Pre-1978 Housing
60Pre-1978 Units
2,966Total Housing Units
LowRisk Level

How Plumas Lake Compares

Plumas Lake
2.0%!<(MISSING)/span>
California
56.7%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Plumas Lake Residents

Most housing in Plumas Lake was built after 1978 (98.0% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Plumas Lake

Get a more detailed risk assessment for a specific address.