Lead Paint Risk in Perris, CA
12.4%Pre-1978 Housing
2,499Pre-1978 Units
20,083Total Housing Units
LowRisk Level
How Perris Compares
What This Means for Perris Residents
Most housing in Perris was built after 1978 (87.6% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Perris
Get a more detailed risk assessment for a specific address.