Lead Paint Risk in Perris, CA

12.4%Pre-1978 Housing
2,499Pre-1978 Units
20,083Total Housing Units
LowRisk Level

How Perris Compares

Perris
12.4%!<(MISSING)/span>
California
56.7%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Perris Residents

Most housing in Perris was built after 1978 (87.6% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Perris

Get a more detailed risk assessment for a specific address.