Lead Paint Risk in Oakley, CA
15.8%Pre-1978 Housing
2,157Pre-1978 Units
13,667Total Housing Units
LowRisk Level
How Oakley Compares
What This Means for Oakley Residents
Most housing in Oakley was built after 1978 (84.2% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Oakley
Get a more detailed risk assessment for a specific address.