Lead Paint Risk in Mather, CA

2.4%Pre-1978 Housing
37Pre-1978 Units
1,537Total Housing Units
LowRisk Level

How Mather Compares

Mather
2.4%!<(MISSING)/span>
California
56.7%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Mather Residents

Most housing in Mather was built after 1978 (97.6% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Mather

Get a more detailed risk assessment for a specific address.