Lead Paint Risk in Goshen, CA

11.6%Pre-1978 Housing
151Pre-1978 Units
1,306Total Housing Units
LowRisk Level

How Goshen Compares

Goshen
11.6%!<(MISSING)/span>
California
56.7%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Goshen Residents

Most housing in Goshen was built after 1978 (88.4% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Goshen

Get a more detailed risk assessment for a specific address.