Lead Paint Risk in Camanche Village, CA
15.1%Pre-1978 Housing
106Pre-1978 Units
702Total Housing Units
LowRisk Level
How Camanche Village Compares
What This Means for Camanche Village Residents
Most housing in Camanche Village was built after 1978 (84.9% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Camanche Village
Get a more detailed risk assessment for a specific address.