Lead Paint Risk in Camanche Village, CA

15.1%Pre-1978 Housing
106Pre-1978 Units
702Total Housing Units
LowRisk Level

How Camanche Village Compares

Camanche Village
15.1%!<(MISSING)/span>
California
56.7%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Camanche Village Residents

Most housing in Camanche Village was built after 1978 (84.9% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Camanche Village

Get a more detailed risk assessment for a specific address.