Lead Paint Risk in Bell Canyon, CA

42.0%Pre-1978 Housing
263Pre-1978 Units
626Total Housing Units
ElevatedRisk Level

How Bell Canyon Compares

Bell Canyon
42.0%!<(MISSING)/span>
California
56.7%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Bell Canyon Residents

Bell Canyon has an elevated level of pre-1978 housing (42.0%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.

Check a Specific Address in Bell Canyon

Get a more detailed risk assessment for a specific address.