Lead Paint Risk in Aliso Viejo, CA
5.4%Pre-1978 Housing
1,099Pre-1978 Units
20,370Total Housing Units
LowRisk Level
How Aliso Viejo Compares
What This Means for Aliso Viejo Residents
Most housing in Aliso Viejo was built after 1978 (94.6% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Aliso Viejo
Get a more detailed risk assessment for a specific address.