Lead Paint Risk in Marion, AR
15.1%Pre-1978 Housing
805Pre-1978 Units
5,315Total Housing Units
LowRisk Level
How Marion Compares
What This Means for Marion Residents
Most housing in Marion was built after 1978 (84.9% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Marion
Get a more detailed risk assessment for a specific address.