Lead Paint Risk in Lost Bridge Village, AR
9.7%Pre-1978 Housing
51Pre-1978 Units
528Total Housing Units
LowRisk Level
How Lost Bridge Village Compares
What This Means for Lost Bridge Village Residents
Most housing in Lost Bridge Village was built after 1978 (90.3% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Lost Bridge Village
Get a more detailed risk assessment for a specific address.