Lead Paint Risk in Floyd, AR

12.1%Pre-1978 Housing
31Pre-1978 Units
257Total Housing Units
LowRisk Level

How Floyd Compares

Floyd
12.1%!<(MISSING)/span>
Arkansas
40.5%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Floyd Residents

Most housing in Floyd was built after 1978 (87.9% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Floyd

Get a more detailed risk assessment for a specific address.