Lead Paint Risk in East End, AR
14.9%Pre-1978 Housing
388Pre-1978 Units
2,609Total Housing Units
LowRisk Level
How East End Compares
What This Means for East End Residents
Most housing in East End was built after 1978 (85.1% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in East End
Get a more detailed risk assessment for a specific address.