Lead Paint Risk in Centerville, AR

0.0%Pre-1978 Housing
0Pre-1978 Units
157Total Housing Units
LowRisk Level

How Centerville Compares

Centerville
0.0%!<(MISSING)/span>
Arkansas
40.5%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Centerville Residents

Most housing in Centerville was built after 1978 (100.0% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Centerville

Get a more detailed risk assessment for a specific address.