Lead Paint Risk in Avilla, AR
13.5%Pre-1978 Housing
84Pre-1978 Units
624Total Housing Units
LowRisk Level
How Avilla Compares
What This Means for Avilla Residents
Most housing in Avilla was built after 1978 (86.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Avilla
Get a more detailed risk assessment for a specific address.