Lead Paint Risk in Valle Vista, AZ

5.3%Pre-1978 Housing
73Pre-1978 Units
1,371Total Housing Units
LowRisk Level

How Valle Vista Compares

Valle Vista
5.3%!<(MISSING)/span>
Arizona
29.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Valle Vista Residents

Most housing in Valle Vista was built after 1978 (94.7% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Valle Vista

Get a more detailed risk assessment for a specific address.