Lead Paint Risk in Valle, AZ

13.5%Pre-1978 Housing
38Pre-1978 Units
281Total Housing Units
LowRisk Level

How Valle Compares

Valle
13.5%!<(MISSING)/span>
Arizona
29.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Valle Residents

Most housing in Valle was built after 1978 (86.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Valle

Get a more detailed risk assessment for a specific address.