Lead Paint Risk in Tusayan, AZ
16.9%Pre-1978 Housing
27Pre-1978 Units
160Total Housing Units
LowRisk Level
How Tusayan Compares
What This Means for Tusayan Residents
Most housing in Tusayan was built after 1978 (83.1% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Tusayan
Get a more detailed risk assessment for a specific address.