Lead Paint Risk in Tubac, AZ

18.3%Pre-1978 Housing
201Pre-1978 Units
1,097Total Housing Units
LowRisk Level

How Tubac Compares

Tubac
18.3%!<(MISSING)/span>
Arizona
29.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Tubac Residents

Most housing in Tubac was built after 1978 (81.7% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Tubac

Get a more detailed risk assessment for a specific address.