Lead Paint Risk in Surprise, AZ

3.0%Pre-1978 Housing
1,827Pre-1978 Units
60,356Total Housing Units
LowRisk Level

How Surprise Compares

Surprise
3.0%!<(MISSING)/span>
Arizona
29.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Surprise Residents

Most housing in Surprise was built after 1978 (97.0% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Surprise

Get a more detailed risk assessment for a specific address.