Lead Paint Risk in San Luis, AZ
9.8%Pre-1978 Housing
907Pre-1978 Units
9,250Total Housing Units
LowRisk Level
How San Luis Compares
What This Means for San Luis Residents
Most housing in San Luis was built after 1978 (90.2% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in San Luis
Get a more detailed risk assessment for a specific address.