Lead Paint Risk in San Luis, AZ

9.8%Pre-1978 Housing
907Pre-1978 Units
9,250Total Housing Units
LowRisk Level

How San Luis Compares

San Luis
9.8%!<(MISSING)/span>
Arizona
29.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for San Luis Residents

Most housing in San Luis was built after 1978 (90.2% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in San Luis

Get a more detailed risk assessment for a specific address.