Lead Paint Risk in Rio Verde, AZ

5.9%Pre-1978 Housing
109Pre-1978 Units
1,861Total Housing Units
LowRisk Level

How Rio Verde Compares

Rio Verde
5.9%!<(MISSING)/span>
Arizona
29.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Rio Verde Residents

Most housing in Rio Verde was built after 1978 (94.1% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Rio Verde

Get a more detailed risk assessment for a specific address.