Lead Paint Risk in Rio Rico, AZ

8.3%Pre-1978 Housing
610Pre-1978 Units
7,322Total Housing Units
LowRisk Level

How Rio Rico Compares

Rio Rico
8.3%!<(MISSING)/span>
Arizona
29.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Rio Rico Residents

Most housing in Rio Rico was built after 1978 (91.7% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Rio Rico

Get a more detailed risk assessment for a specific address.