Lead Paint Risk in Red Mesa, AZ

7.3%Pre-1978 Housing
15Pre-1978 Units
205Total Housing Units
LowRisk Level

How Red Mesa Compares

Red Mesa
7.3%!<(MISSING)/span>
Arizona
29.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Red Mesa Residents

Most housing in Red Mesa was built after 1978 (92.7% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Red Mesa

Get a more detailed risk assessment for a specific address.