Lead Paint Risk in Red Mesa, AZ
7.3%Pre-1978 Housing
15Pre-1978 Units
205Total Housing Units
LowRisk Level
How Red Mesa Compares
What This Means for Red Mesa Residents
Most housing in Red Mesa was built after 1978 (92.7% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Red Mesa
Get a more detailed risk assessment for a specific address.