Lead Paint Risk in Red Lake, AZ

3.3%Pre-1978 Housing
29Pre-1978 Units
874Total Housing Units
LowRisk Level

How Red Lake Compares

Red Lake
3.3%!<(MISSING)/span>
Arizona
29.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Red Lake Residents

Most housing in Red Lake was built after 1978 (96.7% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Red Lake

Get a more detailed risk assessment for a specific address.